합성수지침목의 개요

OVERVIEW

The ballasted track are suffering from excessive maintenance costs to solve the crushing, flowing, falling, and deformation of the ballast. The ballast bond is an artificial abatement technique to solve this problem.

APPLYING SECTION

  • Narrow shoulder width of track bed
  • Crossing, front and back sections
  • Higher grade curve section
  • Ballast track and Slab track connection section
  • Station and Tunnel Section
  • High-speed running section, Tunnel entrance section
  • Section of changing and repairing ballast track

APPLICATION AMOUNT AND PENETRATION DEPTH

Application Amount Penetration Depth
(Temperature 25 ℃ Application condition)
1kg/㎡ Approx. 80~90mm
2kg/㎡ Approx. 120~150mm
2.5kg/㎡ Approx. 170~210mm
3~3.5kg/㎡ Approx. 210~260mm